The Hidden Power of O&M: Practical Tools for Real Energy Savings
What happened
NFMT presentation urged facilities teams to prioritize operational excellence—recalibrating sensors, fixing schedules, and removing control overrides—before spending on capital upgrades. The most concrete point: small O&M changes can materially affect energy and performance outcomes and should be proven at site level prior to major retrofits. Watch whether teams convert this guidance into procurement requirements for calibration and controls-tuning scopes
Why the category manager should care
Treat operational tuning as a real, contractable scope: include calibration, schedule verification, and acceptance testing in supplier statements of work
Key facts
- Presentation advocating operational baseline before capital projects
- Concrete examples: sensor recalibration, schedule optimization, control override removal