Future-proofing the Maui gas pipeline in New Zealand
What happened
Firstgas used Inductabend to produce long‑radius DN750 induction bends to repair a critical New Zealand transmission pipeline. The job required continuous hot induction processing across full 11.5m lengths with redesigned tooling to handle the higher forming loads. This proves local capability for large‑diameter components; track whether the vendor receives follow‑on orders that indicate sustainable regional capacity
Why the category manager should care
Treat this as a real option for emergency repair and planned replacements in APAC where shipping bespoke bends is costly and slow
Key facts
- DN750 transmission pipeline component
- Long‑radius 28 m bending radius
- Processed length approx. 11.5 m per component