Baker Hughes furnishing Southeast Asian deepwater gas project with subsea systems
What happened
Baker Hughes won a contract to supply subsea production systems and digital solutions for a Southeast Asian deepwater gas development. The award includes 17 deepwater horizontal tree systems plus manifolds, control systems and condition-monitoring, with delivery tied to Baker Hughes’ global manufacturing centre and local Indonesian capabilities. Watch supplier delivery schedules and factory lead times because those will determine mobilisation flexibility and spare-parts timing
Why the category manager should care
Treat this as a fixed equipment commitment that tightens delivery windows and increases the importance of verified FAT, spares lists and remote-monitoring handover
Key facts
- 17 deepwater horizontal tree systems
- Includes manifolds, control and distribution systems and Cordant condition monitoring
- Supply leverages local manufacturing and global subsea tree centre