Baker Hughes wins equipment order for CP2 LNG expansion
What happened
Baker Hughes booked an order to supply six liquefaction blocks—covering 12 single mixed‑refrigerant modules—into Venture Global’s CP2 expansion. The award includes compressors, cold boxes, air coolers and integrated control systems, making it operationally significant for OEM capacity and long‑lead scheduling. Watch for supplier allocation notices or deposit requests that would affect buyer leverage and scheduling
Why the category manager should care
Treat this as a confirmed allocation event because the booked scope is multi‑module and directly absorbs OEM capacity
Key facts
- Six liquefaction blocks supporting 12 single mixed‑refrigerant modules
- Scope includes compression trains, cold boxes, air coolers and integrated controls
- Order booked during the second quarter and adds to an active CP2 program