Mooring integrity requires life-cycle thinking as deepwater projects grow more complex
What happened
InterMoor argues mooring systems need life‑cycle, risk‑based integrity management rather than periodic inspections. The article highlights integrating inspection, monitoring and engineering early in FEED so decisions on accessibility and repair options are set before production. For procurement, watch for contract language that mandates monitoring deliverables and inspection access windows
Why the category manager should care
Treat mooring integrity as a contractable lifecycle activity: lock inspection access, monitoring outputs and decision gates during FEED to limit later cost pass‑throughs
Key facts
- Operators shifting from periodic inspections to risk‑based integrity programs
- Inspection findings are being combined with engineering and remaining‑life evaluations
- FEED choices materially influence future maintenance accessibility and costs