WATCH: Hybrid ocean energy construction vessel reaches Norway for completion
What happened
The first hybrid ocean energy construction vessel (OECV) built by VARD has reached Norway for final outfitting. The ship will perform IMR, pipe laying, subsea construction, features DP2 capability and a 250‑ton heave‑compensated crane, and is entering final completion—watch delivery timing and the option for a sister ship which affects fleet capacity
Why the category manager should care
Treat the arrival as a verifiable supply signal: it increases potential capacity but only once delivered and positioned for APAC work—don't assume immediate local availability
Key facts
- DP2 capability
- 250‑ton heave‑compensated subsea crane
- Accommodation for 120 personnel