FPSO construction starts in China for Angola's ultra-deepwater development
What happened
Steel cutting has begun at a Chinese yard for the Greater PAJ FPSO topside after the project reached FID. The topside work sits alongside major contracts for rigid pipelines and flexible flowlines awarded to Saipem and TechnipFMC, making this an active fabrication program rather than an isolated announcement. Watch yard slot reports and major subcontractor mobilisation dates to understand whether Chinese fabrication demand will affect APAC delivery windows
Why the category manager should care
This is a confirmed fabrication start that will push demand for steel, pipes and module engineering capacity; treat supplier lead times as shortening quickly
Key facts
- First steel cutting for FPSO topside at Haiyang yard
- FPSO nameplate: 95,000 barrels per day oil and 70 million scf/day gas export capacity
- Saipem secured a ~$1 billion subsea and pipeline engineering and installation contract