SLB OneSubsea secures Baleine expansion contract, Kutei North umbilical award
What happened
SLB OneSubsea secured EPC work to supply subsea production systems for Phase 3 of Baleine and has long‑length umbilical manufacturing orders tied to separate Indonesian work. The scope includes manufacturing, installation, commissioning and life‑of‑field support plus continuous umbilicals with heavy lift and deepwater install constraints. This is operationally real: it creates multi‑year fabrication and installation demand—watch for named‑yard reservations, transport plans and supplier quote validity windows
Why the category manager should care
Treat this as a sustained demand signal that will consume fabrication and marine capacity; lock named‑yard and transport commitments early
Key facts
- Phase 3 subsea production systems for 13 wells (EPC + life‑of‑field support)
- Single continuous umbilical fabrications reported at 30 km length and heavy system weight
- Umbilical designed for deepwater installation constraints (design pressure and water depth no