DOF’s 2010-built vessel staying longer with Equinor in Norwegian waters
What happened
DOF confirmed a contract extension for the anchor‑handling tug supply vessel Skandi Vega with Equinor, keeping the vessel on assignment. The extension locks that high‑spec AHTS into Equinor work and tightens spot availability for deepwater anchor handling and heavy‑lift tasks; watch for further extensions that consume similar assets
Why the category manager should care
Treat this as a firm reduction in regional spot fleet; an extension removes a high‑spec asset from open availability and changes mobilisation planning
Key facts
- Skandi Vega confirmed on extended assignment with Equinor
- Designed for deepwater anchor handling with large deck and winch capacity