Exploration round-up: S2 readies first drilling at Jillewarra
What happened
S2 Resources is preparing first drilling at the Jillewarra joint venture in Western Australia after key licences were granted, moving the project into operational mobilisation. The initial campaign is an aircore program described as a substantial, widely spaced first‑pass program and environmental approvals are being lodged ahead of aircore work next month. Watch aeromagnetic survey results and permit timing because those will determine contractor RFQs and mobilisation windows
Why the category manager should care
Treat this as a verifiable local demand event that requires immediate availability checks for aircore rigs, camp capacity and sampling logistics
Key facts
- New first drilling campaign at Jillewarra, Western Australia
- Initial program described as a wide‑spaced aircore first‑pass campaign
- Environmental approvals and aeromagnetic survey results pending before mobilisation