The Hidden Power of O&M: Practical Tools for Real Energy Savings
What happened
NFMT presentation content highlights the hidden returns from prioritizing operations and maintenance before capital upgrades. The practical tools recommended include sensor recalibration, schedule optimization, and addressing control overrides as the low-friction path to measurable energy performance. Watch whether organizations adopt baselining as a mandatory precondition for new projects
Why the category manager should care
Treat O&M baselining as a procurement gate: insist on documented evidence that operations are optimized before approving upstream capital
Key facts
- Emphasis on recalibrating sensors and optimizing schedules
- Focus on operational baseline before capital investment