Drilling
What happened
Indonesia Energy has advanced pre‑drilling operations for two onshore wells at the Kruh Block, signalling a near‑term campaign. The update notes drilling is expected to start soon, making this a concrete APAC demand signal buyers should verify with the operator. Watch whether the operator confirms spud dates and any changes to completion scope or contractor requirements
Why the category manager should care
Treat this as a concrete APAC demand signal and verify operator timelines because two‑well sequences can lock local crews and equipment for the campaign window
Key facts
- Two‑well programme at Kruh Block
- Pre‑drilling operations advanced with drilling expected to begin imminently