Supporting future-ready pipelines
What happened
STATS Group demonstrated the BISEP line-stopping tool on a live high-pressure hydrogen pipeline and has also used it for CO₂ isolation without interrupting flow. The tool delivered fail-safe double block-and-bleed isolation on a 30km hydrogen project and is compatible with a wide range of diameters and pressures, making it operationally viable for in-service tie-ins. Watch whether vendors start packaging isolation tools and field teams as bundled services and how that changes tender scopes
Why the category manager should care
This is an operational option you can buy into: isolation tools materially change whether you must plan for shutdown or can run live tie-ins
Key facts
- Demonstrated on a 30km live hydrogen pipeline
- BISEP compatibility listed up to 56-inch diameters and pressures exceeding 150 bar
- Proven double block-and-bleed isolation without production interruption