Eight-well drilling program ups oil output at Southeast Asian offshore field
What happened
Valeura Energy completed an eight-well campaign in the Gulf of Thailand that included the company’s first multi-lateral development well. The campaign brought multiple horizontal development legs online and shifted production at the Nong Yao platforms, showing multi-lateral techniques are operationally deployed in the field. Watch whether the operator repeats the multi-lateral design on follow-on programs, which would make certain completions and tooling repeatedly required
Why the category manager should care
Treat this as operational demand, not a one-off; repeatable multi-lateral work raises value of providers with long-lateral completions tooling and rapid remobilisation capability
Key facts
- Completed eight-well campaign at the Nong Yao field
- Included operator’s first multi-lateral development well with dual horizontal production legs
- Contracted jack-up rig (Mist) remains regionally mobilised for follow-on programmes